{"id":1761,"date":"2026-08-10T20:00:00","date_gmt":"2026-08-10T20:00:00","guid":{"rendered":"https:\/\/geec.vn\/?p=1761"},"modified":"2026-08-10T09:22:16","modified_gmt":"2026-08-10T09:22:16","slug":"giam-sat-he-thong-nang-luong-microgrid-giai-phap-thong-minh-cho-doanh-nghiep-viet-nam","status":"publish","type":"post","link":"https:\/\/geec.vn\/en\/giam-sat-he-thong-nang-luong-microgrid-giai-phap-thong-minh-cho-doanh-nghiep-viet-nam\/","title":{"rendered":"Microgrid energy system monitoring: A smart solution for Vietnamese businesses."},"content":{"rendered":"<p class=\"wp-block-paragraph\">With electricity prices rising by an average of 8\u201312% annually and power outages in industrial zones causing tens of millions of dong in losses per hour, microgrids integrated with IoT monitoring are no longer a luxury. This is a competitive advantage that Vietnamese businesses are missing out on. GEEC analyzes the architecture, practical effectiveness, and detailed deployment roadmap.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h1 class=\"wp-block-heading\">Integrated Microgrid System Diagram<\/h1>\n\n\n\n<h3 class=\"wp-block-heading\">Main ingredients<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Solar power (Solar PV): 120 kW<\/li>\n\n\n\n<li>EVN power grid: 80 kW<\/li>\n\n\n\n<li>EMS Controller: 200 kW<\/li>\n\n\n\n<li>BESS Battery: 87%<\/li>\n\n\n\n<li>Total load: 160 kW<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>System status<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Solar power: Currently generating<\/li>\n\n\n\n<li>EVN Grid: Connection<\/li>\n\n\n\n<li>EMS: Auto Mode<\/li>\n\n\n\n<li>BESS pin: Charging<\/li>\n\n\n\n<li>Load: Peak hours<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Microgrid Monitoring Active<\/strong><br>Data is updated every 500 ms.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h1 class=\"wp-block-heading\">Key indicators<\/h1>\n\n\n\n<h3 class=\"wp-block-heading\">30\u201345%<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Average reduction in electricity costs when implementing Microgrid combined with IoT monitoring at FDI factories in Vietnam.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">99.5%<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Power supply reliability when BESS is available as a backup.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3\u20135 years<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The payback period for a microgrid system in a medium-sized plant (1\u20135 MW).<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h1 class=\"wp-block-heading\">What is a microgrid and how does it differ from a conventional solar power system?<\/h1>\n\n\n\n<p class=\"wp-block-paragraph\">Many businesses confuse conventional solar power systems (Solar PV On-grid) with microgrid systems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">On-grid solar power systems only add one more power source to the grid but cannot operate during grid power outages and lack the ability to intelligently manage power sources.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A microgrid is a complete small-scale power grid capable of operating independently (Island Mode) or in parallel with the national power grid.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Integrated system:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Solar power<\/li>\n\n\n\n<li>Diesel generator<\/li>\n\n\n\n<li>Wind power<\/li>\n\n\n\n<li>Natural gas source<\/li>\n\n\n\n<li>BESS storage batteries<\/li>\n\n\n\n<li>EMS (Energy Management System)<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">EMS is the control center that helps make decisions:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>When should we use solar power?<\/li>\n\n\n\n<li>When to use grid electricity?<\/li>\n\n\n\n<li>When to charge the battery?<\/li>\n\n\n\n<li>When to discharge the battery?<\/li>\n\n\n\n<li>When can electricity be sold to the grid (if permitted)?<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Differentiating value<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Conventional solar power systems only help reduce electricity bills when it's sunny.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Microgrid uses EMS to optimize electricity costs 24\/7:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Buy electricity from the grid during off-peak hours.<\/li>\n\n\n\n<li>Save to BESS<\/li>\n\n\n\n<li>Discharge the battery during peak hours.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">K\u1ebft qu\u1ea3 c\u00f3 th\u1ec3 gi\u00fap doanh nghi\u1ec7p gi\u1ea3m 30\u201345% chi ph\u00ed \u0111i\u1ec7n.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h1 class=\"wp-block-heading\">5 core components of a smart microgrid<\/h1>\n\n\n\n<h2 class=\"wp-block-heading\">1. Renewable energy sources (Solar PV \/ Wind)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Rooftop or ground-mounted solar power is an energy source with virtually zero operating costs after investment<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In Vietnam:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Southern Vietnam: 4.5\u20135.5 kWh\/m\u00b2\/day<\/li>\n\n\n\n<li>Mi\u1ec1n B\u1eafc: 3.5\u20134.5 kWh\/m\u00b2\/ng\u00e0y<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">2. BESS Battery Storage System<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The Battery Energy Storage System is the \"heart\" that gives Microgrid its flexibility.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Current popular technologies:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Lithium-ion LFP<\/li>\n\n\n\n<li>Lifespan: 10\u201315 years<\/li>\n\n\n\n<li>4,000\u20136,000 charge\/discharge cycles<\/li>\n\n\n\n<li>High level of safety<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Common storage capacities:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>100 kWh to 10 MWh<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">3. EMS \u2013 Energy Management System<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">EMS is the central brain of the system.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mission:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Collect real-time data.<\/li>\n\n\n\n<li>Load forecast<\/li>\n\n\n\n<li>Optimize your battery charging\/discharging schedule.<\/li>\n\n\n\n<li>Optimizing TOU electricity pricing<\/li>\n\n\n\n<li>Chuy\u1ec3n sang Island Mode khi m\u1ea5t l\u01b0\u1edbi<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Th\u1eddi gian chuy\u1ec3n \u0111\u1ed5i d\u01b0\u1edbi 20 ms.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">4. IoT Monitoring System &amp; Dashboard<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Smart Meter<\/li>\n\n\n\n<li>Power Quality Analyzer<\/li>\n\n\n\n<li>IoT Gateway<\/li>\n\n\n\n<li>Cloud Platform<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The Facility Manager can monitor the entire system from anywhere.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">5. Connect to the EVN grid (PCC)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Point of Common Coupling cho ph\u00e9p:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Buying electricity from EVN<\/li>\n\n\n\n<li>Grid-tied control<\/li>\n\n\n\n<li>Switch to Island Mode when needed.<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">6. Demand Response<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">EMS has the capability to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Ph\u00e2n lo\u1ea1i ph\u1ee5 t\u1ea3i<\/li>\n\n\n\n<li>\u0110i\u1ec1u khi\u1ec3n t\u1ea3i kh\u00f4ng quan tr\u1ecdng<\/li>\n\n\n\n<li>Peak Shaving<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">M\u1ee9c gi\u1ea3m c\u00f4ng su\u1ea5t \u0111\u1ec9nh c\u00f3 th\u1ec3 \u0111\u1ea1t:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>25\u201330%<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h1 class=\"wp-block-heading\">What IoT systems need to measure in a Microgrid<\/h1>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th>Parameter<\/th><th>Device<\/th><th>Frequency<\/th><\/tr><tr><td>C\u00f4ng su\u1ea5t P,Q<\/td><td>Smart Meter<\/td><td>500 ms<\/td><\/tr><tr><td>SOC Pin BESS<\/td><td>BMS Battery<\/td><td>1 second<\/td><\/tr><tr><td>B\u1ee9c x\u1ea1 m\u1eb7t tr\u1eddi<\/td><td>Pyranometer<\/td><td>1 minute<\/td><\/tr><tr><td>Ch\u1ea5t l\u01b0\u1ee3ng \u0111i\u1ec7n<\/td><td>PQA Analyzer<\/td><td>Li\u00ean t\u1ee5c<\/td><\/tr><tr><td>Nhi\u1ec7t \u0111\u1ed9 ph\u00f2ng pin<\/td><td>Sensor nhi\u1ec7t \u0111\u1ed9<\/td><td>30 seconds<\/td><\/tr><tr><td>T\u1ea7n s\u1ed1 l\u01b0\u1edbi<\/td><td>Grid Analyzer<\/td><td>100 ms<\/td><\/tr><tr><td>D\u00f2ng \u0111i\u1ec7n ph\u1ee5 t\u1ea3i<\/td><td>CT Sensor<\/td><td>1 second<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h1 class=\"wp-block-heading\">The role of fire prevention and control in BESS<\/h1>\n\n\n\n<p class=\"wp-block-paragraph\">Lithium-ion batteries can experience the following issues:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Thermal Runaway<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u0110\u00e2y l\u00e0 hi\u1ec7n t\u01b0\u1ee3ng ch\u00e1y d\u00e2y chuy\u1ec1n c\u1ef1c k\u1ef3 nguy hi\u1ec3m.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">GEEC integration:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>B\u00e1o ch\u00e1y Panasonic Fire &amp; Security<\/li>\n\n\n\n<li>Smoke monitoring<\/li>\n\n\n\n<li>Temperature monitoring<\/li>\n\n\n\n<li>Abnormal alert<\/li>\n\n\n\n<li>Clean Agent Clean Air Fire Suppression System<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">It helps detect and address incidents before fires spread.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h1 class=\"wp-block-heading\">Microgrid context in Vietnam<\/h1>\n\n\n\n<h2 class=\"wp-block-heading\">Manufacturing &amp; Industrial Sector<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">FDI factories located at:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Binh Duong<\/li>\n\n\n\n<li>Dong Nai<\/li>\n\n\n\n<li>Vinh Phuc<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">\u0110ang ch\u1ecbu \u00e1p l\u1ef1c:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>ESG<\/li>\n\n\n\n<li>Carbon Neutral<\/li>\n\n\n\n<li>RE100<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Resorts and hotels<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Areas:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Phu Quoc<\/li>\n\n\n\n<li>\u0110\u00e0 N\u1eb5ng<\/li>\n\n\n\n<li>Nha Trang<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Prioritize<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Continuous electricity<\/li>\n\n\n\n<li>Customer experience<\/li>\n\n\n\n<li>Reduce operating costs.<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Class A office building<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Area:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Hanoi<\/li>\n\n\n\n<li>TP.HCM<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Savings potential:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>25\u201335% of the electricity bill<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Hospital<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Y\u00eau c\u1ea7u:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Switching power in under 0.5 seconds<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Microgrid with BESS:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>&lt; 20 ms<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h1 class=\"wp-block-heading\">Actual ROI analysis for a 2 MW power plant.<\/h1>\n\n\n\n<h3 class=\"wp-block-heading\">H\u00f3a \u0111\u01a1n \u0111i\u1ec7n hi\u1ec7n t\u1ea1i<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">~850 tri\u1ec7u VN\u0110\/th\u00e1ng<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Chi ph\u00ed \u0111\u1ea7u t\u01b0<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Solar 1.5 MW + BESS 1 MWh + EMS<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">~28 billion VND<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Monthly savings<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Solar PV: ~230 million VND<\/li>\n\n\n\n<li>Peak Shaving: Approximately 95 million VND<\/li>\n\n\n\n<li>EMS TOU: ~65 tri\u1ec7u VN\u0110<\/li>\n\n\n\n<li>Gi\u1ea3m chi ph\u00ed diesel: ~20 tri\u1ec7u VN\u0110<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Total savings<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">~4.9 billion VND\/year<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Return on investment<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>3.8 \u2013 4.5 years<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h1 class=\"wp-block-heading\">Implementation roadmap over 6 months<\/h1>\n\n\n\n<h2 class=\"wp-block-heading\">Phase 1 (January\u2013February)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Energy audit and system design.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Phase 2 (February\u2013March)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Request permission and select equipment:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Huawei<\/li>\n\n\n\n<li>SMA<\/li>\n\n\n\n<li>CATL<\/li>\n\n\n\n<li>BYD<\/li>\n\n\n\n<li>ABB<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Phase 3 (March\u2013May)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Installation:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Solar PV<\/li>\n\n\n\n<li>BESS<\/li>\n\n\n\n<li>Smart Meter<\/li>\n\n\n\n<li>EMS<\/li>\n\n\n\n<li>ATS<\/li>\n\n\n\n<li>Panasonic Fire<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Phase 4 (May\u2013June)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Operational training.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Set up alerts:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Zalo OA<\/li>\n\n\n\n<li>Email<\/li>\n\n\n\n<li>Dashboard<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Phase 5 (After June)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">T\u1ed1i \u01b0u h\u00f3a li\u00ean t\u1ee5c v\u00e0 hi\u1ec7u ch\u1ec9nh EMS.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h1 class=\"wp-block-heading\">Khung ph\u00e1p l\u00fd Vi\u1ec7t Nam 2026<\/h1>\n\n\n\n<h3 class=\"wp-block-heading\">Self-consumption solar power<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">No special permit is required.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Grid-connected solar power<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Registration with EVN is required.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Selling surplus electricity<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Waiting for the new mechanism after FIT.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">BESS independent<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">There is no specific legal framework yet.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h1 class=\"wp-block-heading\">Conclude<\/h1>\n\n\n\n<p class=\"wp-block-paragraph\">If the business is currently issuing electronic invoices <strong>100 million VND\/month or more<\/strong>Microgrids have generally reached their investment-effectiveness threshold.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Main benefits:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Reduce electricity costs by 30\u201345%.<\/li>\n\n\n\n<li>Reliability up to 99.5%<\/li>\n\n\n\n<li>Return on investment in 3\u20135 years<\/li>\n\n\n\n<li>Supports ESG and Carbon Neutral<\/li>\n\n\n\n<li>Integrating fire protection systems for BESS<\/li>\n\n\n\n<li>Remote monitoring and operation via IoT.<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h1 class=\"wp-block-heading\">Contact GEEC<\/h1>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>GEEC \u2013 GEEC Trading and Engineering Joint Stock Company<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Hotline: 0798 619 999<\/li>\n\n\n\n<li>Email: info@geec.vn<\/li>\n\n\n\n<li>Website: https:\/\/geec.vn<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>GEEC offers a free Microgrid ROI analysis service based on the business's actual electricity bills.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>Khi gi\u00e1 \u0111i\u1ec7n t\u0103ng b\u00ecnh qu\u00e2n 8\u201312% m\u1ed7i n\u0103m v\u00e0 s\u1ef1 c\u1ed1 m\u1ea5t \u0111i\u1ec7n t\u1ea1i khu c\u00f4ng nghi\u1ec7p thi\u1ec7t h\u1ea1i h\u00e0ng ch\u1ee5c tri\u1ec7u \u0111\u1ed3ng m\u1ed7i gi\u1edd, microgrid t\u00edch h\u1ee3p gi\u00e1m s\u00e1t IoT kh\u00f4ng c\u00f2n l\u00e0 xa x\u1ec9. \u0110\u00e2y l\u00e0 \u0111\u00f2n b\u1ea9y c\u1ea1nh tranh m\u00e0 doanh nghi\u1ec7p Vi\u1ec7t Nam \u0111ang b\u1ecf l\u1ee1. GEEC ph\u00e2n t\u00edch ki\u1ebfn [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1853,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"zakra_page_container_layout":"customizer","zakra_page_sidebar_layout":"customizer","zakra_remove_content_margin":false,"zakra_sidebar":"customizer","zakra_transparent_header":"0","zakra_logo":0,"zakra_main_header_style":"default","zakra_menu_item_color":"","zakra_menu_item_hover_color":"","zakra_menu_item_active_color":"","zakra_menu_active_style":"","zakra_page_header":false,"footnotes":""},"categories":[28],"tags":[94,48,95,97,98,93,96,99],"class_list":["post-1761","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-iot-thong-minh","tag-bess-pin-luu-tru","tag-geec","tag-giam-sat-nang-luong-thong-minh","tag-he-thong-dien-mat-troi-khu-cong-nghiep","tag-iot-nang-luong","tag-microgrid-viet-nam","tag-quan-ly-nang-luong-toa-nha","tag-smart-energy-monitoring"],"_links":{"self":[{"href":"https:\/\/geec.vn\/en\/wp-json\/wp\/v2\/posts\/1761","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/geec.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/geec.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/geec.vn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/geec.vn\/en\/wp-json\/wp\/v2\/comments?post=1761"}],"version-history":[{"count":4,"href":"https:\/\/geec.vn\/en\/wp-json\/wp\/v2\/posts\/1761\/revisions"}],"predecessor-version":[{"id":1854,"href":"https:\/\/geec.vn\/en\/wp-json\/wp\/v2\/posts\/1761\/revisions\/1854"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/geec.vn\/en\/wp-json\/wp\/v2\/media\/1853"}],"wp:attachment":[{"href":"https:\/\/geec.vn\/en\/wp-json\/wp\/v2\/media?parent=1761"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/geec.vn\/en\/wp-json\/wp\/v2\/categories?post=1761"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/geec.vn\/en\/wp-json\/wp\/v2\/tags?post=1761"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}