Fire alarm system installation
Install the control panel, detectors, push buttons, bells, lights, modules, and signal wiring according to the approved drawings.
GEEC implements fire protection systems for buildings, factories, industrial parks, hotels, shopping malls, and other projects requiring high reliability. We maintain strict control from shop drawings, materials, installation, commissioning, to acceptance and handover.
The construction solution focuses on safety, operational stability, long-term maintainability, and effective coordination with the investor, building management, supervisory consultant, and M&E general contractor.
Organize construction according to drawings, control materials, conduct integrated testing, and hand over completion documents.
GEEC handles the entire process, from field equipment, piping, signal cables, and control panels to interlocking systems and operational handover.
Install the control panel, detectors, push buttons, bells, lights, modules, and signal wiring according to the approved drawings.
Construction of pipelines, sprinklers, hydrants, valves, fire pumps, and other fire fighting water supply systems.
Install gas systems, aerosols, early fire detection systems, or specialized solutions for electrical rooms, servers, warehouses, and clean rooms.
Install exit lights, emergency lights, signage, and evacuation support systems along the escape routes.
Connect fire alarms to elevators, pressurized fans, smoke extraction systems, magnetic door locks, audio systems, BMS, and dashboards.
Prepare as-built drawings, inspection reports, material records, operating manuals, and system handover documents.
An effective fire protection project requires simultaneous control of schedule, materials, installation quality, site safety, and coordination with other M&E disciplines.
Review drawings, prepare shop drawings, determine pipeline routes, cable routes, equipment locations, and construction plans.
Inspect incoming materials, Certificates of Origin (CO) and Certificates of Quality (CQ), equipment codes, accessories, and installation conditions at the construction site.
Construction proceeds according to schedule, including continuity testing, voltage testing, equipment configuration, and system interlock testing.
Complete the documentation, as-built drawings, test reports, operating instructions, and maintenance plan.
GEEC organizes construction in phases to reduce risks, minimize overlap with other disciplines, and ensure timely handover.
Receiving documents, surveying the site, and planning materials and personnel for construction.
Installation of piping, cables, equipment, control panels, and other system components.
Test equipment, check signals, test voltage, perform interlock testing, and address any issues.
Completion of work, operation instruction, handover of documentation, and proposal of maintenance plan.
GEEC optimizes construction solutions according to the specific characteristics of each project, from high-traffic areas to manufacturing environments and technical zones requiring high reliability.
Installation of addressable, interlocking, and floor-level fire alarm systems.
Implement the system for the production area, warehouse, electrical room, and factory.
Installation of fire alarm, evacuation, pressurization, smoke extraction, and resident warning systems.
Construction of early warning systems, specialized fire fighting equipment, and technical area supervision.
GEEC focuses on material quality, installation accuracy, operational stability, and system maintainability after handover.
Materials, equipment, installation routes, and test results are controlled at each stage.
Comply with workplace safety regulations, construction methods, and site coordination.
As-built drawings, inspection reports, equipment documentation, and operating instructions.
Provide support for routine inspections, troubleshooting, and system upgrades as the project expands.
GEEC's engineering team will assist with surveying, developing construction plans, controlling materials, and implementing the system in accordance with the project schedule.